Medical Office Space Available at Mercy Health – St. Rita’s in Lima, Ohio

Posted on Apr 10, 2022 in Insights
Medical Office Space Available at Mercy Health – St. Rita’s in Lima, Ohio

On the Campus of Mercy Health – St. Rita’s there is exceptional Class A Medical Office Space available for lease.  This space is in the 770 High Street Professional Building, located at the hub of the outpatient services campus.   770 Buidling Quality Office Space – Spring 2022 Suites are available for single-practitioners and large practices, […]

Roof Installation at Capstone 41

Posted on Mar 30, 2022 in Insights
Roof Installation at Capstone 41

Precast panels and steel are placed, so the roof deck and materials are now being installed at Capstone 41.

Nearing Enclosure of Capstone 35

Posted on Mar 17, 2022 in Insights
Nearing Enclosure of Capstone 35

The North Building at Capstone 35 has roof decking in place, and the contractor is now working on the South Building.  The spring thaw is making the site a bit of a challenge, but that was expected.  With walls up the buildings have already taken shape, and when enclosed there will be more activity onsite. […]

Precast Arrives at Capstone 35

Posted on Feb 1, 2022 in Insights
Precast Arrives at Capstone 35

  In early morning light, February construction work began with placement of the first precast panel on the Capstone 35 site.  Until this time, work had been limited to on-the-ground and under-the-ground with site preparations and placement of footing.  Precast panels will be installed by Shaw Construction over the next several weeks, bringing form to […]

Favorable Weather Helps Construction Progress at Capstone 41

Posted on Nov 17, 2021 in Insights
Favorable Weather Helps Construction Progress at Capstone 41

A mild fall is aiding Berghammer Construction as they prepare the Capstone 41 site for the first of three planned warehouse buildings.  Work is proceeding on the initial 202,455 SF warehouse building, being developed as spec.  At this time, footings are being placed in anticipation of precast panels due to arrive in early 2022.  Other […]

Sitework Underway at Capstone 35

Posted on Nov 12, 2021 in Insights

Shaw Construction is well underway with site work at Capstone 35, racing to prepare the site and install building footings before winter settles in. This aerial photograph shows the site as of today (11/12/21).  On the right is the pad for the north building, fairly completed.  Work is now concentrated on the south pad to […]

Historic Monument Dedicated in Ryan Business Park

Posted on Oct 7, 2021 in Insights
Historic Monument Dedicated in Ryan Business Park

City and County officials met on a beautiful June afternoon to celebrate the dedication of the Historic Monument and Park located on the banks of the Oak Creek in the Ryan Business Park.  The community’s Autum 2021 Current Magazine, the City’s publication to citizens, featured a story on the monument.  A copy of the Current […]

Industrial Development Proposed for Burnsville Infill Site

Posted on Jul 26, 2021 in Insights
Industrial Development Proposed for Burnsville Infill Site

Capstone Quadrangle is proceeding with development of a 2-building industrial project near the intersection of I-35W and Highway 13 in Burnsville, MN.  With pending City approval awaiting final review, construction will begin on the two 116,000 SF buildings in fall 2021.  Completion of the projects is anticipated in late fall 2022.  The project has been […]

Capstone is Part of Ryan Road / S. 13th Street Activity

Posted on Jun 21, 2021 in Insights
Capstone is Part of Ryan Road / S. 13th Street Activity

Capstone’s proposed 191,400 SF industrial building, to be located in proximity to the Ryan Road interchange of I-94, is under consideration by Oak Creek’s planning commission.  Capstone’s project joins other developments in proximity to Capstone’s Ryan Business Park, where Amazon has a 2.3 million SF fulfillment center.  Sean Ryan, reporter for the Milwaukee Business Journal, […]

Historic Monument Park awaits Dedication

Posted on May 18, 2021 in Insights
Historic Monument Park awaits Dedication

Construction work on the Historic Monument Park has finished, and the monument sign is installed.  The park is situated on the north bank of Oak Creek near Wisconsin Union Railroad’s original 1872 creek crossing.  The rail bridge was abandoned in 1906, when the track was moved 950 feet to the east (where the rail still […]